[email protected]

About Us

We are experienced in turn-key substation installations from 5kv to 500kv and can also perform any kind of substation additions/upgrades. Our turn- key installations include site prep, civil work, steel erection, electrical bus installation, aluminum welding and relay/scada installation. CN104234471B - A kind of tour aisle, the HVDC converter The present invention relates to a kind of tour aisle, the HVDC converter substation valve Room, it is positioned in the high voltage direct current transmission project current conversion station

CN105672687A - Reinforcement method for concrete poles

The invention discloses a reinforcement method for concrete poles of a transformer substation structural support. The reinforcement method is characterized in that steel tubes are additionally arranged on the outer sides of concrete poles of the transformer substation structural support and poured with grout to form a steel tube reinforced concrete structure; the steel tubes, the grout and the China Dead End Steel Pole and Switch Substation Framework China Dead End Steel Pole and Switch Substation Framework, Find details about China Power Plant /Substation Steel Structure, Power Plant Steel Structure from Dead End Steel Pole and Switch Substation Framework - Qingdao Mingzhu Steel Structure Co., Ltd. China Megatro 800kv Substation Framework (MGT-SF1489 Welding:ANSI/AWS D1.1-06 In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet project requirements. MEGATRO can optimize design and make 750KV , 800KV , 1000KV substation framework by solid, high strength, proper span distance, good wind resistance material, and

Helmark and Falcon Steel Rebuild World Trade Center

Depending on the weldment configuration on the shop floor at any given time, 160,000 to 220,000 pounds of framework are fabricated each day by Helmarks 25 in-shop weld operators. Welding on the grade 50 steel includes both partial and full penetration fillet welds at high deposition rates. How to start, establish, and grow a welding or Oct 22, 2013 · Figure 1:A One-person Mobile Welding . I would say you should at least be able to pass a 6G E6010 open root with an E7018 fill and cap welding certification, and a stainless 6G open root TIG all the way out certification. At the very minimum, you should be able to pass a 4G welding cert. Invincible structural framework From Leading Steel Giants Structure Assembly 1.Steel Framework:Component:H-Column, H-Beam & C/Z-Purlin Connection of steel structure method:Welding, Bolted 2.Surface treatment:Painting, Galvanized 3.Roof &Wall:colored steel tiles or colored steel sandwich panel as per request 4.Doors:Rolling or Pushing, as request V.

Lattice Structures - Qingdao Mingzhu

Lattice Structures, some European countries called iron/steel pylon/electricity pylon. Q235,Q345,Q420,Q460,ASTM A527 A36, GR50, GR65, ST-37, ST-44, ST-52, S355JR, S355J2G3, SS41, SS50, SS55, Fe 430B, Fe 510B, and others China equivalent steel materials. All components are dip-hot galvanized with uniform. 1. Co2 welding and submerged arc auto New tab page - MSNAs US nears 600,000 deaths, 70% vaccination goal likely to fall short; California on track for Tuesday reopening:COVID-19 updates USA TODAY Zhejiang Shengda Steel Tower Co., Ltd. - Steel Tower At present, the annual output of ZSST for steel tower is up to 150,000 tons, for steel tube tower, steel pole, substation framework and steel structure is 30,000 tons, for spiral welded steel pipe is 40,000 tons, for longitudinal welded pipe is 20,000 tons and its galvanization capacity is 150,000 tons.

A framework for welding process selection SpringerLink

Feb 05, 2020 · This paper develops a framework to differentiate welding processes, for industrial purposes, according to two families of criteria. It is constructed as a phase-wise decision support system that reviews objects with physical and economic criteria. The first phase excludes the non-functioning processes from the panel, and catching the best candidate processes are left to the second phase.